With East Monsoon:
ng the ashlars
resecting
and coking and providing such new bloens as way
be necessary forming
a. Strik & Carton he drankie₤17,280 Cime concrete 10 beer in width at the bach of the Coring throughout the entire length of the Praças, raking out and he pointing the face points of the wall, and forming Water Channel of granite pitching along miner margin of roadway) Reconstruction of Praya Bential. Reconstructing the Wall and Praya from White: Landing Steps to "the priental Bank steps in
50
Brought forward £ 17280
on
Accordance with fiq; the Annexed Nawing 3: forming a the existing bootings the Oriental Bank Steps to Wardley Street? providing
a new wall ou
from
a covering of hy draulic lime concrete at the baen of the new wall over the entire gridth of the
roadway, forminga of 32 840
₤32 pitch-paved surface for wheel trakic along Praya
Central and also a water
Channel Shirting the inside of Same; providing an apron of granite blocks
the to proted the toe & work where the bottom is but exclusive ofthe
of grand,
formation of the intercepting Sewer.
50120
Forward
17280
No comments yet.
Private notes are available after approval.